Genesys contributes to the solution of the energy crisis of Ecuador.
January 15, 2010 at 1:15 pm | Commisioning, Construction, News, Power Tech | Sin comentarios

6 x GE TM 2500 Pascuales, Ecuador. First fire turbine No. 6, 30th of Diciembre 2009
At the beginning of the month of December 2009, we accepted the challenge of developing and executing the EPC (in conjunction with GE and SANTOS CMI) of 6 X GE TM2500 that would support the National Interconnected Electric System (SIN) for a total of 120MW helping solve the Ecuadorian electric crisis.

6 x GE TM 2500 Pascuales, Ecuador. Positioning of turbine No. 6
Electrical engineering, concept and detail, Procurement, Construction and Assembly, Commissioning and Start-up of the first three TM2500 turbines located close to the Enrique García Plant in Pascuales, Guayaquil was developed in a record time of four weeks thanks to our experience and teamwork on electric generation Fast Track projects developed in a variety of Latin-American countries.

6 x GE TM 2500 Pascuales, Ecuador. 69KV Bay and Tower of Interconnection to SNI.
Engineering, supply, assembly and construction of the 69KV portal with the respective Bay Equipment crews. Assembly of the equipment for the patio included the Commissioning and Startup crews.

6 x GE TM 2500 Pascuales, Ecuador. XFMR 13.8/69KV 100MVA
Mounting, filter press, assembly, tests and principal transformer start-up.

6 x GE TM 2500 Pascuales, Ecuador.
Engineering (civil, electromechanical), manufacture of lattices, mounting and construction of 2 transmission towers for interconnecting to the SNI.

1 x GE TM 2500 Manta, Ecuador.
The EPC work (in conjunction with GE and SANTOS CMI) began the first week of December, starting-up in record time the 24th of December 2009.